March 14, 2014

Facade VERBUND headquarters \ SOLID architecture

SOLID architecture just completed the facade of the Verbund Headquarter in the inner City of Vienna.

1. Starting point and the task set

The headquarters of the Verbund AG is a block perimeter development built around a central courtyard in Vienna's first district. It was erected between 1952 and 1954 to designs by Carl Appel and is bordered on three sides by public streets or squares. The street facade extends from the square known as Am Hof along Heidenschuss towards Freyung and into Tiefer Graben. The block perimeter development is made up of two volumes, one facing onto Am Hof and the other towards Freyung.

Inline image 1

Inline image 2

In formal terms the building refers back to the architecture of the interwar period. On the other hand the economical use of design and decorative elements, for example the window reveals of real stone, is characteristic of the post-war era.

In 1982 the plinth zone and the areas of facade that frame the large projecting bay elements on Heidenschuss and Tiefer Graben were remodelled to designs by architect Sepp Stein in the volume oriented towards Freyung. The storey-height glazing facing towards Freyung was replaced by horizontal ribbon windows with brown metal parapet claddings. This, however, weakened the building's orientation towards Freyung.

Inline image 3

As this facade design had reached the end of its useful life, an invited competition was set up for the redesign of these areas. This competition was won by SOLID architecture.

Inline image 4

The objectives of the design

The new design of the facade towards Freyung – one of the most prominent locations in Vienna – should represent the Verbund AG as a producer of electricity with the aid of hydraulic power.
The facade should be integrated in its historic setting. The Verbund headquarters is the same height as the neighbouring buildings, but with its nine storeys has almost twice as many floor levels.
The redesign of the facades should allow the different elements of Carl Appel's Verbund building to be perceived as a coherent ensemble.
The Verbund headquarters should be oriented more strongly towards Freyung in urban planning terms. In addition the shop entrance on the corner to Freyung, the sole area of the Verbund headquarters accessible to the general public, should be emphasized.
In functional terms the new facades should use state of the art technology.

Inline image 5

2. Conceptual study of the theme "facade" on Freyung

The ensemble on Freyung is made up of buildings dating from various epochs which have been rebuilt and extended over the course of time. Overlaying a building with traces of different time layers is the conceptual starting point for the new design. It uses design principles from different eras of architectural history to integrate the volume of the building in the historic ensemble on Freyung.

Additional filters and levels of meaning were placed in front of the history and characteristics of the post-war building, overlaying the facade with a second layer that sits in front of it. By mounting this additional layer the new design, which initiates a dialogue between the existing Verbund building and the ensemble on Freyung, becomes clearly legible. An apparently ephemeral envelope or shell is created, which, depending on the weather conditions and the distance of the viewer to the building, allows different planes and aspects of the facade to emerge in the foreground.

Inline image 6

3. A veil of silver waves – the technical implementation of the design concept

By separating the facade into two layers the inner layer could be upgraded simply and without the need for major interventions. A second layer is laid like a veil of silver waves in front of the original facade but at the same time allows a view of what lies behind it.

The entire veil of waves is designed with a single repeated facade element that is used at different scales. This element consists of stainless steel rectangular section tubes curved in a wave-like shape, arranged in an offset pattern and held in position by a frame.

In formal terms the wave-like form of the facade elements refers to the dynamics of water in motion. The wave symbolizes the Verbund and, in an abstract way, informs about the area in which the company operates. The gleaming silver veil of waves represents the Verbund towards the city. The ornament encases the building volume, which is detached from the internal layout of the building core, and lends it a symbolic content.

Inline image 7

The arrangement of the facade elements makes reference to the historic neighbouring buildings, enabling the Verbund building to become part of the ensemble. The new facade elements are mounted in rows that follow the floor levels of the building. It is only on the facade facing towards Freyung that the new layer departs from the existing division into floor levels: here nine storeys of almost the same height are reduced to five by a design that extends across the floor levels. This move adapts the scale of the Verbund headquarters to that of the surrounding buildings.

The use of axes of symmetry – comparable with the secondary axes of symmetry in the surrounding historic buildings – additionally emphasizes the facade onto Freyung. Here the facade elements are not arranged additively but using mirror symmetry. This axial mirroring of the facade elements creates a new ornamental configuration that further emphasises this facade.

Inline image 8

In the plinth zone the veil of waves delineates the load bearing structure of the facade in that the glazed areas are left free and the new facade elements are placed only in front of the structural piers. The facade elements facing onto the balconies above the large projecting bays can be opened. On the other floors two facade elements for each room behind are made as a rescue opening, comparable to a shutter.

Inline image 9

4. The inner plane – the functional facade

The rear facade plane continues the design of the facade from Am Hof to Tiefer Graben. In the two-storey plinth zone the same natural stone cladding to the piers and the post and lintel facades with anodised aluminium cover pieces were used. The facades to the upper floors were insulated with mineral wool and rendered in the same colour as the facade onto Am Hof. Making the facades of the two building volumes more similar helps the Verbund headquarters to be read as a coherent ensemble.

Inline image 10

The inner plane of the facade deals with all the technical aspects of the building envelope such as thermal and noise insulation, as well as protection from sun and glare. The old windows were replaced by combination windows (a modern form of the traditional Viennese double windows) of the same size. The solid parapets were left unaltered for structural reasons. For the offices where windows had to be replaced this meant short fitting times. Thus, the facade was refurbished without having to close down the building.

+ Project credits / data

Project: Facade VERBUND headquarters – a veil of silver waves

VERBUND headquarters
Am Hof 6a, Facade at the corner Heidenschuss / Tiefer Graben
1010, Vienna

Purpose: Redesign and thermal retrofit of the facade of the VERBUND headquarters

Direct commission: No, first prize in an invited competition
Project status: Project completed
Competition: March / April 2008
Start of planning: September 2009
Start of construction: April 2010
Completion: October 2010
Facade area:
2,720m² thermal retrofit
1,320m² redesign of facade

Construction: Mineral wool rendered, stainless steel facade elements consisting of a total of 10,500 linear meters of stainless steel rectangular section tubes, 50x20x2mm
Spatial program: Facade design
Awards, prizes: Exhibition "Gebaut 2010" at MA 19 (Vienna's Municipal Department of Architecture and Urban Design): 21 outstanding projects completed in Vienna in 2010

Other participants:
Architekt Heinz Neumann ZT GmbH
WERKSTATTWIEN + A2K
Knechtl Architekten
gerner°gerner plus architects

Architects: SOLID architecture ZT GmbH | http://www.solidarchitecture.at/
Project management: Arch. DI Christoph Hinterreitner
Assisted by Arch DI Christine Horner, DI Daniel Glaser
Client: VERBUND AG
Structural engineering and technical consultancy: RWT PLUS ZT GmbH
Building physics: RWT PLUS ZT GmbH
Site supervision and health and Ruster and safety management: Woschitz Engineering ZT GmbH
Building contractor: Dipl. Ing. Wilhelm Sedlak Gesellschaft m.b.H.
Aluminium facades: RIEGLER METALLBAU GmbH
Facade elements: RIEGLER METALLBAU GmbH
Stone mason: RADA NATURSTEIN GmbH
Project photographer: Günter Kresser, Kurt Kuball

+ All images and drawings courtesy SOLID architecture | Photo by Günter Kresser & Kurt Kuball

Inline image 11

Inline image 12

Inline image 13

Inline image 14

Inline image 15

Inline image 16

Inline image 17

Inline image 18

Inline image 19

Inline image 20

Inline image 21

Inline image 22

Inline image 23

Inline image 24

Inline image 25

Inline image 26

Inline image 27

Inline image 28

Inline image 29

Inline image 30

Inline image 31

Inline image 32


DEF